Michel Baudin's Blog
Ideas from manufacturing operations
  • Home
  • Home
  • About the author
  • Ask a question
  • Consulting
  • Courses
  • Leanix™ games
  • Sponsors
  • Meetup group

Nov 8 2012

Metrics — Companies focus on what is easy to measure

See on Scoop.it – lean manufacturing

in a recent Forrester report, analyst Craig Le Clair, argues that much of the information companies collect is just noise. “We often focus on what’s easiest to measure,” he writes, “not what’s most important.”

See on www.processexcellencenetwork.com

Share this:

  • Click to print (Opens in new window) Print
  • Click to share on Facebook (Opens in new window) Facebook
  • Click to share on LinkedIn (Opens in new window) LinkedIn
  • Click to share on Reddit (Opens in new window) Reddit
  • Click to share on X (Opens in new window) X
  • Click to email a link to a friend (Opens in new window) Email

Like this:

Like Loading...

By Michel Baudin • Blog clippings • 1 • Tags: BPM, Metrics

Nov 8 2012

Superheros of Manufacturing | Karen Wilhelm

See on Scoop.it – lean manufacturing

Superman, Wonder Woman, or Spider-Man action figures may have captured your attention when you were a kid, but did you ever see action figures for Maintenance Man or Maintenance Woman?

I didn’t think so.

Rarely cast as heroes, members of the maintenance department come to the rescue when a machine is down and it takes superpowers to get it back online. They respond to a crisis with their super-strengths, which include inventiveness, know how, and a wide range of technical skills. Then, like Clark Kent, the maintenance men and women go back to their roles as ordinary characters.

See on www.manufacturingpulse.com

Share this:

  • Click to print (Opens in new window) Print
  • Click to share on Facebook (Opens in new window) Facebook
  • Click to share on LinkedIn (Opens in new window) LinkedIn
  • Click to share on Reddit (Opens in new window) Reddit
  • Click to share on X (Opens in new window) X
  • Click to email a link to a friend (Opens in new window) Email

Like this:

Like Loading...

By Michel Baudin • Blog clippings • 0 • Tags: Lean manufacturing, Maintenance, TPM

Nov 7 2012

John Shook: Lean Management Success Depends on a Problem-Solving Culture

See on Scoop.it – lean manufacturing

But problem solving is a problem at companies accustomed to hiding problems, according to Shook.Cambridge, MA (PRWEB) November 05, 2012 A company’s “attitude towards problems” determines if it succeeds or fails at a lean management transformation,…

See on news.yahoo.com

Share this:

  • Click to print (Opens in new window) Print
  • Click to share on Facebook (Opens in new window) Facebook
  • Click to share on LinkedIn (Opens in new window) LinkedIn
  • Click to share on Reddit (Opens in new window) Reddit
  • Click to share on X (Opens in new window) X
  • Click to email a link to a friend (Opens in new window) Email

Like this:

Like Loading...

By Michel Baudin • Press clippings • 0 • Tags: Lean, Lean implementation, Management

Nov 6 2012

Takt time – Early work at Junkers in Germany

In the TPS Only discussion group on LinkedIn, Joachim Knuf provided the following information, to which I have added a few illustrations:

“Junkers was building an aircraft for infantry support in 1917/18, the J4. After building airplanes in a handcraft mode for some years, this was the first attempt to meet larger demands. Junkers was known for not simply designing a product but the production process along with it. Clearly very lean and practiced by Toyota.”

The founder of the company was Hugo Junkers (pronounced ‘yoonkerz). He died in 1935 and was in no way affiliated with the Nazis, who took away his company and later besmirched his name by claiming association with it. Because the company still bore his name, it is linked in the minds of World War II forced laborers with their experience.

 

“The J4 was build in modules, incorporating components delivered from outside vendors, incorporating fixtures, templates and gauges for economic benefit. Subsequently, the F13, build in 1919/20 as the world’s first civilian passenger plane, was designed from the start with modular manufacturing in mind. This plane was built for customers around the world, with production numbers as high as 60/month.”

The only surviving J4, at the Canada Aviation and Space Museum.

 

 

 

Junkers F13 in 1925.

 

 

 

“Production was organized to an overall completion schedule. As a result, completion of modules had to be structured and synchronized. Final assembly was organized into six phases, performed at specific fixtures. Highly specialized work teams had a set amount of time to complete their fixture-based task, then moved on to the next fixture to repeat the job, followed by another specialized team (what we think of as a caravan system these days). The increment was the ‘progression interval’ (Fortschrittszeit). Airplanes/modules stayed in place. The result was a finished plane every 9 hours. This approach was shared with Junkers facilities working in other industries.

By 1926 this system was developed to the point that subassemblies could be produced off the main assembly and connected to it with moving lines that moved at set intervals. These intervals were then referred to as ‘Takte’ (plural, ‘takt intervals’). With the new W33/34 (first East-West Atlantic crossing in 1928), there was interest in the US to produce the plane in license, in preparation of which Junkers developed a complete production plan to allow large-scale production, identifying the most economical methods. At that point Junkers had 40% of the international market share. Some years later, Lufthansa orders for the new model Ju 52/3m required the further refinement of the ‘takt method’ (Taktverfahren), incorporating new technology and equipment.”

Junkers W34 at the Canada Aviation and Space Museum.

 

 

 

 

“After 1933 (and the nationalization of Junkers by the Nazis) this allowed the mass production of airplanes in serial assembly. To produce the required numbers of planes, eventually also using forced labor, Junkers began constructing large subassemblies in decentral locations within 20 miles of the main assembly facility, delivered just in time. Major subassemblies then moved down a ‘takt avenue’ (Taktstrasse) from station to station, remaining a uniform, prescribed ‘takt duration’ (Taktdauer) in each, creating the Junkers ‘Airplane High Volume Series Production to the Minute’ (Flugzeug-Grossreihenfertigung auf die Minute). Changes in takt were used to adjust production volume to demand. Continuous improvement was an integral aspect of this system (which also certified workers on their self-inspection skills).”

A 2010 video entitled Fischertechnik Taktstrasse mit Sortierung depicts a “Taktstrasse” as a transfer line.

Share this:

  • Click to print (Opens in new window) Print
  • Click to share on Facebook (Opens in new window) Facebook
  • Click to share on LinkedIn (Opens in new window) LinkedIn
  • Click to share on Reddit (Opens in new window) Reddit
  • Click to share on X (Opens in new window) X
  • Click to email a link to a friend (Opens in new window) Email

Like this:

Like Loading...

By Michel Baudin • History • 12 • Tags: Takt, Takt time

Nov 2 2012

Takt time: where this strange expression comes from

In the TPS Only discussion group on LinkedIn, Casey Ng posted the following:

“It is quite clear that Takt is a foreign word (外来語) to both English and Japanese.
Its origin could come from German : Taktzeit.
Refer to “Walking Through Lean History” by Jim Womack ( President and founder of Lean Enterprise Institute:

‘By the late 1930s, the German aircraft industry had pioneered takt time as a way to synchronize aircraft final assembly in which airplane fuselages were moved ahead in unison throughout final assembly at a precise measure (takt) of time.’

Therefore, Toyota could have adopted the term and application from Mitsubishi who had technical link with the German in aircraft manufacturing.
But Toyota did breathe new life to the concept of takt by integrating it to the flow principle and inventory reduction of JIT. Therefore, any attempt to implement JIT without proper understanding of takt with Taiichi Ohno’s precise definition of takt time could fail.”

To which Bertrand Chauveau added:

“Takt is a German word

Casey, you are right. It is a German word used in music to describe the rhythm. Mitsubishi brought it back to Japan. Association of Japanese manufacturers deployed it throughout the industry. Thus Toyota adopted and adapted the concept to their production.”

And Frederick Stimson Harriman:

“Regarding the German origins of “takt,” I have never heard any of the Japanese consultants I worked with say where they thought the origin was, but a consultant from JIPM did say to me once that Shingo used the term, and so Bertrand’s explanation makes sense.”

Following are the results of my own research into the matter:

Takt is indeeed a German word, designating a bar on sheet music, but also an engine stroke as in Viertaktmotor (four-stroke engine), and the interval between trains on a line where they run regularly (picture by David J. Anderson), as shown below:

Lean implementers in Germany today, however, are just as confused about it as Americans, and I have heard some refer to Takt as the process time.

But how exactly did “Takt” migrate from Germany to Japan? I think the key reason the Japanese consultants Frederick worked with didn’t dwell on it is that it happened during World War II, and that Japan’s war time alliance with Nazi Germany is not a source of pride.

Digging further on the input from Casey and Bertrand, I found in Americanization and Its Limits a chapter by Katsuo Wada and Takao Shiba reporting that the military aircraft arm of Mitsubishi learned about the German “Takt system” from Junkers engineers in 1942, and had implemented it in the Nagoya works in fuselage assembly by 1943, under the name of zenshinshiki (前進式?). From a contemporary observer’s description, it looks very much like the pulse line system currently used for military aircraft at Boeing, with fuselage sections assembled at fixed stations and moved at a fixed interval — the Takt — to the next station.

This is to be contrasted with the moving assembly line concept used for aircraft also in World War II by Ford in Willow Run, MI, for the B24, and currently by Boeing for commercial aircraft. And it is not the same concept as takt-driven production today. But there are also accounts in German Aircraft of the Second World War of the German aircraft industry using moving lines for subassemblies during the war.

The Nagoya location of this Mitsubishi plant may not be coincidental to the transfer of the term to Toyota, which is still headquartered in that area. It may have been carried in the heads of unemployed military aircraft engineers joining Toyota after the war.

For the German part of the story, in German Aircraft of the Second World War, J.R. Smith and A.L. Kay, in their discussion of the Ju-88, explain “In August 1938, Ernst Udet laid down the Takt system of construction for all large state-owned firms such as Junkers and Arado…”

A Ju-88 flying in 1936

I also found the following picture of a Ju-88 assembly line in 1941, which suggests that the fuselages move sideways between operations rather than nose-to-tail:

Ju-88 Assembly Line in 1941

This is where the trail ends for now. Udet committed suicide in 1941, and was therefore not involved in the transfer to Mitsubishi. I have yet to find a detailed description of the Junkers “Taktsystem.”

Share this:

  • Click to print (Opens in new window) Print
  • Click to share on Facebook (Opens in new window) Facebook
  • Click to share on LinkedIn (Opens in new window) LinkedIn
  • Click to share on Reddit (Opens in new window) Reddit
  • Click to share on X (Opens in new window) X
  • Click to email a link to a friend (Opens in new window) Email

Like this:

Like Loading...

By Michel Baudin • History • 7 • Tags: Takt, Takt time

«< 113 114 115 116 117 >»

Follow Blog via Email

Enter your email address to follow this blog and receive notifications of new posts by email.

Join 580 other subscribers

Recent Posts

  • Update on Data Science versus Statistics
  • How One-Piece Flow Improves Quality
  • Using Regression to Improve Quality | Part III — Validating Models
  • Rebuilding Manufacturing in France | Radu Demetrescoux
  • Using Regression to Improve Quality | Part II – Fitting Models

Categories

  • Announcements
  • Answers to reader questions
  • Asenta selection
  • Automation
  • Blog clippings
  • Blog reviews
  • Book reviews
  • Case studies
  • Data science
  • Deming
  • Events
  • History
  • Information Technology
  • Laws of nature
  • Management
  • Metrics
  • News
  • Organization structure
  • Personal communications
  • Policies
  • Polls
  • Press clippings
  • Quality
  • Technology
  • Tools
  • Training
  • Uncategorized
  • Van of Nerds
  • Web scrapings

Social links

  • Twitter
  • Facebook
  • Google+
  • LinkedIn

My tags

5S Automation Autonomation Cellular manufacturing Continuous improvement data science Deming ERP Ford Government Health care industrial engineering Industry 4.0 Information technology IT jidoka Kaizen Kanban Lean Lean assembly Lean Health Care Lean implementation Lean Logistics Lean management Lean manufacturing Logistics Management Manufacturing Manufacturing engineering Metrics Mistake-Proofing Poka-Yoke Quality Six Sigma SMED SPC Standard Work Strategy Supply Chain Management Takt time Toyota Toyota Production System TPS Training VSM

↑

© Michel Baudin's Blog 2025
Powered by WordPress • Themify WordPress Themes
%d