See on Scoop.it – lean manufacturing
In the Seattle Times article Boeing Dreamliner on track, but rework may stretch to 2015, aerospace executives reported to Wall Street analysts the company’s historic scientific milestone of bending the fabric of time and space, as Dreamliner production achieved a state of being both on track and notably behind at once.
See on www.gembapantarei.com
Like this:
Like Loading...
Related
Nov 27 2012
Following the Muri Mura Strategy | Jon Miller
See on Scoop.it – lean manufacturing
In the Seattle Times article Boeing Dreamliner on track, but rework may stretch to 2015, aerospace executives reported to Wall Street analysts the company’s historic scientific milestone of bending the fabric of time and space, as Dreamliner production achieved a state of being both on track and notably behind at once.
See on www.gembapantarei.com
Contents
Share this:
Like this:
Related
By Michel Baudin • Blog clippings • 0 • Tags: Aerospace, Boeing, Continuous improvement, Lean, Mura, Muri