May 22 2015
The World Class Manufacturing programme at Chrysler, Fiat & Co. |Torbjørn Netland
“The company-specific production system (XPS) of Chrysler is the World Class Manufacturing (WCM) concept, developed by the Fiat Group in 2006. But, what exactly is the WCM? And, what does Chrysler see as keys to success in WCM?
A few answers are given these days at the 4th annual Lean Management Journal Conference in Birmingham, UK: in his morning keynote, Mauro Pino—Vice President for vehicle assembly operations and the Head of World Class Manufacturing in the Chrysler Group—explains how Chrysler “achieves manufacturing excellence across the globe”. Pino stresses that “WCM is how we do our business. Period.” The presentation reminds me of the WCM factories I visited in Brazil, Spain and Sweden last year, all of which confirmed that WCM can be a powerful improvement system—if implemented seriously. Let’s take a closer look at the concept of WCM.”
May 28 2015
Why Your Lean and Six Sigma Improvement Efforts Aren’t Driving Better Results | IndustryWeek | John Dyer
“Don’t expect a positive ROI from your lean and Six Sigma investments if they are nothing but a pretty picture.
I once had a plant manager tell me his factory had implemented Six Sigma, but there was not a single statistical process control chart. How is that possible? Another had the control charts in place but refused to allow the operator to shut the process down when it indicated an out-of-control condition. Another plant claimed it was lean but had a dozen bins of parts stacked on the floor as part of a two bin system. Another plant routinely violated the daily production plan by rescheduling orders, and then the plant blamed the supply chain for causing it to frequently run out of parts (which then drove it to change the schedule… a vicious circle).”
Source: www.industryweek.com
Share this:
Like this:
By Michel Baudin • Press clippings 8 • Tags: Fake Lean, LAME, Lean, Lean-Lite, Six Sigma, SPC