Feb 8 2012
The Original Kanbans
Via Scoop.it – lean manufacturing
The kanban has met many adventureson its way to becoming a popular tool for the limitation of tasks, projects and works in process. As superhero origin stories go, kanban has an interesting one. As long ago as 8th century Japan, guidelines were set down for the forms and functions of kanban as corporate logos and shop signs. Just as the study of the use and evolution of forms of kanban as an improvement tool is illustrative as to the development of management various industries from manufacturing to software development, an examination of kanban as Japanese shop signs is instructive of the historical and cultural changes that took place.
Read more: Lean Manufacturing Blog, Kaizen Articles and Advice | Gemba Panta Rei
Via www.gembapantarei.com
Nov 2 2012
Takt time: where this strange expression comes from
In the TPS Only discussion group on LinkedIn, Casey Ng posted the following:
To which Bertrand Chauveau added:
And Frederick Stimson Harriman:
Following are the results of my own research into the matter:
Takt is indeeed a German word, designating a bar on sheet music, but also an engine stroke as in Viertaktmotor (four-stroke engine), and the interval between trains on a line where they run regularly (picture by David J. Anderson), as shown below:
Lean implementers in Germany today, however, are just as confused about it as Americans, and I have heard some refer to Takt as the process time.
But how exactly did “Takt” migrate from Germany to Japan? I think the key reason the Japanese consultants Frederick worked with didn’t dwell on it is that it happened during World War II, and that Japan’s war time alliance with Nazi Germany is not a source of pride.
Digging further on the input from Casey and Bertrand, I found in Americanization and Its Limits a chapter by Katsuo Wada and Takao Shiba reporting that the military aircraft arm of Mitsubishi learned about the German “Takt system” from Junkers engineers in 1942, and had implemented it in the Nagoya works in fuselage assembly by 1943, under the name of zenshinshiki (前進式?). From a contemporary observer’s description, it looks very much like the pulse line system currently used for military aircraft at Boeing, with fuselage sections assembled at fixed stations and moved at a fixed interval — the Takt — to the next station.
This is to be contrasted with the moving assembly line concept used for aircraft also in World War II by Ford in Willow Run, MI, for the B24, and currently by Boeing for commercial aircraft. And it is not the same concept as takt-driven production today. But there are also accounts in German Aircraft of the Second World War of the German aircraft industry using moving lines for subassemblies during the war.
The Nagoya location of this Mitsubishi plant may not be coincidental to the transfer of the term to Toyota, which is still headquartered in that area. It may have been carried in the heads of unemployed military aircraft engineers joining Toyota after the war.
For the German part of the story, in German Aircraft of the Second World War, J.R. Smith and A.L. Kay, in their discussion of the Ju-88, explain “In August 1938, Ernst Udet laid down the Takt system of construction for all large state-owned firms such as Junkers and Arado…”
A Ju-88 flying in 1936
I also found the following picture of a Ju-88 assembly line in 1941, which suggests that the fuselages move sideways between operations rather than nose-to-tail:
Ju-88 Assembly Line in 1941
This is where the trail ends for now. Udet committed suicide in 1941, and was therefore not involved in the transfer to Mitsubishi. I have yet to find a detailed description of the Junkers “Taktsystem.”
Share this:
Like this:
By Michel Baudin • History 7 • Tags: Takt, Takt time