Safety Stocks: Beware of Formulas
A formula you find in a book or learn in school is always tempting. It is a “standard.” If you follow it, others are less likely to challenge your results. These results, however, may be worthless unless you take a few precautions. Following are a few guidelines:
- Don’t use a formula you know nothing about. Its validity depends on assumptions that may or may not be satisfied. You don’t need to know how to prove the formula, but you need to know its range of applicability.
- Examine your data. Don’t just assume they meet the requirements. Examine their summary stats, check for the presence of outliers, generate histograms, scatter plots, time series, etc.
- Don’t make up missing data. If you are missing the data you need to estimate a parameter, find what you can infer about the situation from other parameters, by other methods. Do not plug in arbitrary values.
- Make your Excel formulas less prone to error by using named ranges rather than cell coordinates. If a formula is even slightly complicated, referring to variables by names like “mean” or “sigma” makes formulas easier to proof-read than with names like “AJ” or “AK.”
The safety stock formula for the reorder point method
Safety stock is a case in point. The literature gives you a formula that is supposed to allow you to set up reorder point loops with just the minimum amount of safety needed to prevent shortages under certain conditions of variability in both your consumption rate and your replenishment lead time. It is a beautiful application of 19th century mathematics but I have never seen it successfully used in manufacturing.
Let us look more closely at what it is so you can judge whether you would want to rely on it. Figure 1 shows you a model of the stock over time when you use the Reorder Point method and both consumption and replenishment lead time vary according to a normal distribution. The amount in stock when the reorder point is crossed should be just sufficient to cover your needs until the replenishment arrives. But since both replenishment lead time and demand vary, you need some safety stock to protect against shortages.
Figure 1. The reorder point inventory model
If your demand is the sum of small quantities from a large number of agents, such as sugar purchases by retail customers in a supermarket, then the demand model makes sense. In a manufacturing context, there are many situations in which it doesn’t. If you produce in batches, then the demand for a component item will be lumpy: it will be either the quantity required for a batch or nothing. If you use heijunka, it will be so close to constant that you don’t need to worry about its variations.
What about replenishment lead times? If in-plant transportation is by forklifts dispatched like taxis, replenishment lead times cannot be consistent. On the other hand, if it takes the form of periodic milk runs, then replenishment lead times are fixed at the milk run period or small multiples of it. With external suppliers, the replenishment lead times are much longer, and cannot be controlled as tightly as within the plant, and a safety stock is usually needed.
Let us assume that all the conditions shown in Figure 1 are met. Then there is a formula for calculating safety stock that you can find on Wikipedia or in David Simchi-Levy’s Designing and Managing the Supply Chain (pp. 53-54). Remember that it is only valid for the Reorder Point method and that it is based on standard deviations of demand and lead time that are not accessible for future operations and rarely easy to estimate on past operations. The formula is as follows:
- S is the safety stock you need.
- C is a coefficient set to guarantee that the probability of a stockout is small enough. You can think of it a number of standard deviations above the mean item demand needed to protect you against shortages. In terms of Excel built-in functions, C is given by:
C = NORMSINV(Service level)
Service level | C |
---|---|
90.0% | 1.28 |
95.0% | 1.64 |
99.0% | 2.33 |
99.9% | 3.09 |
- The other factor, under the radical sign, is the corresponding standard deviation.
- μL and σL are the mean and standard deviations of the lead time.
- μD and σD are the mean and standard deviation of the demand per unit time, so that the demand for a period of length T has a mean of μD xT and a standard deviation of σDx √T
Case study: Misapplication of the safety stock formula
This formula is occasionally discussed in Manufacturing or Supply Chain Management discussion groups, but I have only ever seen one attempt to use it, and it was a failure. It was for the supply of components to a factory, and 14 monthly values were available for demand, but only an average for lead times.
The first problem was the distribution of the demand, for which 14 monthly values were available. This is too few for a histogram, but you could plot their cumulative distribution and compare it with that of a normal distribution with the same mean and standard deviation, as in Figure 2. You can tell visually that the actual distribution is much more concentrated in the center than the normal model, which is anything but an obvious fit. Ignoring such objections, the analyst proceeded to generate a spreadsheet.
Figure 2. Actual versus normal cumulative distribution
The second problem is that he entered the formula incorrectly, which was not easy to see, because of the way it was written in Excel. The formula in the spreadsheet was as follows:
C*SQRT((AJ4*AL4^2)+(AI4^2*AM4^2))
then, looking at the spreadsheet columns, you found that they were used as follows:
- AJ for Standard Deviation of Daily Demand, and
- AL for Average Replenishment time.
And therefore the first term under the square root sign was σDxμL2 instead of μLxσD2.
The third problem was that the formula requires estimates of standard deviations for both consumption and replenishment lead times, but no data was available on the latter. To make the formula produce numbers, the standard deviations of replenishment lead times was arbitrarily assumed to be 20% of the average.
For all of these reasons, the calculated safety stock values made no sense, but nobody noticed. They caused no shortage, and the “scientific” formula proved that they were the minimum prudent level to maintain.
Sizing safety stocks in practice
There is no universal formula to determine an optimal size of safety stocks. What can often be done is to simulate the operation of a particular replenishment loop under specified rules. For a simulation of a Kanban loop using Excel, see Lean Logistics, pp. 208-213.
No calculation or simulation, however, is a substitute for keeping an eye on what actually happens on the shop floor during production. One approach is to separate the safety stock physically from the regular, operational stock and monitor how often you have to dig into it. If, say, six months go by without you ever needing it, you are probably keeping too much and you cut it in half. With a Kanban loop, you tentatively remove a card from circulation. If no shortage results, then the card was unnecessary. If a shortage occurs, you return the card and look for an opportunity to improve the process so that the card can be removed.
Mar 13 2012
How to eliminate “Muri,” or overburdening
“Muri, Muda, Mura” is often mentioned in the Japanese manufacturing literature as a trio of evils to avoid. Of the three, Muda gets the most attention. Usually translated as waste, it designates everything we do in a factory that is unnecessary. For a change, let us focus on Muri.
Muri, in everyday Japanese, means impossible, with the nuance of unreasonable or unsustainable. A person working exceptionally hard is said to be doing Muri. Other words are used to say that something would violate the laws of physics, or that it is socially improper or inopportune. When there is Muri in your process, it means that you are asking people to work too hard, which results in defects, burnout, repetitive stress injuries, or even accidents. Conversely, removing Muri means making your process humanly sustainable, so that is can be executed as well at the end of a shift as at the beginning, by a 50-year-old or a 20-year-old, a man or a woman, 5 or 7 feet tall.
It cannot be repeated often enough that Lean is not about making people work harder but instead, in the tradition of Frank and Lillian Gilbreth, in making the work easier to do. When you observe a truly Lean plant, you do not see operators hurrying. Instead, you see them working steadily, at a sustainable pace, at jobs that are carefully choreographed for effectiveness and efficiency. A key example of Muri elimination is the raku-raku seat shown above. It is a device introduced at Toyota in the 1990s and now adopted by many car makers to remove the need for operators to crawl into car bodies in order perform assembly tasks inside.
There are many tools to remove Muri. You can easily notice that an operator is overburdened by direct observation in the shop. A more systematic approach is to use Toyota’s TVAL to rate jobs based on the weight operators have to carry and how long they have to carry it. TVAL establishes an equivalence between combinations, so that, for example, carrying 4 lbs for 200 seconds is equivalent in terms of fatigue impact to carrying 10 lbs for 4 seconds. You then focus on the jobs with highest TVAL ratings and improve these jobs to reduce it.
Once you know which job to focus on, you record it on video and review it with the operator to identify ways to make it easier or to offload parts of it to others with lighter burdens. If the job involves interactions between operators and machines, you analyze with with a work combination chart to improve task sequencing and identify tasks within the job that need better tooling or a better work station layout.
Share this: